| 000 | 00683nam a22002057a 4500 | ||
|---|---|---|---|
| 999 |
_c39486 _d39486 |
||
| 003 | OSt | ||
| 005 | 20180629104416.0 | ||
| 008 | 161010b xxu||||| |||| 00| 0 eng d | ||
| 040 |
_aUCULIB _cUCULIB |
||
| 082 |
_222 _aD625.761 _bMUT |
||
| 100 | 1 | _aMutyaba, Johnson. | |
| 245 | 1 | 2 |
_aUpgrading of Bugujju-Seeta Road from Gravel to Bituminous Standard / _cMutyaba Johnson. |
| 260 |
_as.l. : _bs.n., _cc2015. |
||
| 300 |
_axiv, 94 p. : _bill. ; _c30 cm. |
||
| 500 | _aIncludes appendices. | ||
| 502 | _aThesis (M.A)- Uganda Christian University, 2015. | ||
| 504 | _aIncludes bibliographical references (p. 91-93). | ||
| 650 |
_aroad upgrading. _vbituminous standard |
||
| 942 |
_2ddc _cDIS |
||